FRP for Smelting & Refining
Off-gas duct, gas cleaning, dampers and acid-plant equipment for high-temperature, corrosive service.
Smelter and refinery gas handling is one of FRP’s toughest jobs, and one Crimar has done for decades: off-gas duct, dampers, expansion joints, scrubbers, quench sections and acid-plant tanks and covers for non-ferrous smelters, plus steel, alloy and cast equipment sourced through our sister company in China.
The challenge
Smelter off-gas carries sulfur dioxide and trioxide, weak sulfuric acid condensate, abrasive dust and trace fluorides, often under vacuum and with constant thermal cycling. Where blast gates open from the furnace or hot gas enters a quench, temperature changes in seconds. Unprotected metal corrodes quickly and coatings fail; poorly designed FRP blisters at the hot spots.
FRP and sourced equipment for smelters
| Area | Duty | What we supply |
|---|---|---|
| Off-gas handling | SO₂/SO₃, weak acid condensate, solids, vacuum | FRP duct 48–120 in., transitions, stacks |
| Isolation and expansion | Hot, dirty gas; thermal growth | FRP and FRP-lined dampers; Crimar FRP expansion joints |
| Gas cleaning | Acid mist, quench, humidification | Scrubbers, humidifying tower covers, demister housings, wet ESP interiors |
| Acid plant | Weak and strong acid | Acid pump tanks, weak-acid and cooling tower piping, strong-acid valves, hot acid cooler tube bundles |
| Metallurgical castings | Molten slag and metal | Slag pots, ladles and wear liners |
A typical off-gas duct specification
For one copper smelter off-gas service (13–15 % SO₂, 10 % dilute sulfuric acid, entrained solids and trace fluorides, −40 to 80 °C), the resin manufacturer’s written recommendation was epoxy vinyl ester throughout, a synthetic surfacing veil backed by boron-free ECR-glass chopped-strand mat, a corrosion barrier of at least 2.5 mm, post-cure at 80 °C for 4 hours, and an abrasion-resistant liner where solids impinge. Where hot gas hits the duct or a quench vessel, we add a graphite veil and graphite-filled resin to the barrier so heat spreads into the structural wall instead of blistering the liner.
Project record
- Copper smelters in Texas, New Mexico and Arizona: 48, 72, 84, 96, 102 and 120 in. off-gas duct systems with dampers, expansion joints, transitions and flanges, including field installation at operating smelters.
- Glencore PASAR copper smelter, Philippines (2017–2024): on-site FRP inspection and installation supervision; weak-acid and cooling tower piping, FRP duct, a humidifying tower cover, acid pump tank, isolation damper, demister housing, grating, a boiler, steel piping, stainless cladding, insulation and strong-acid valves.
- Glencore, Chile and Australia: an on-site rebuild of wet ESP interiors and an FRP expansion joint (2016); stainless steel tube bundles for hot acid coolers (2019).
- Chemical waste incineration plant, Nebraska: duct for 360 °F hydrochloric acid gas.
- Magnesium integration project, Qinghai, China (Hatch, 2014): 46 FRP scrubbers, towers and condensers up to 4.7 m in diameter for HCl drying and granulation off-gas.
Standards
| Standard | Applies to |
|---|---|
| SMACNA Thermoset FRP Duct Construction Manual | Off-gas and process duct |
| ASME RTP-1; ASTM D3299 / D4097 | Tanks and vessels; RTP-1 for pressure, vacuum and hazardous service |
| ISO 9001, ITP and MDR | All equipment; spark test, Barcol and visual inspection of duct to ASME RTP-1 criteria |
How we work with smelters
Crimar mainly builds to the drawings and specifications of the end user and their engineering company, and adds the design input that is specific to FRP: resin and corrosion-barrier selection, laminate thickness, stiffening, nozzles, flanges, thermal expansion and supports. Every project runs on an inspection and test plan with hold and witness points and ends with a Manufacturing Data Record. We make FRP equipment in the USA, Mexico and China depending on the project, to Crimar’s specifications, and install it or supervise installation on site where needed.
Smelter work is usually tied to a shutdown, so schedule and fit matter as much as the laminate. We work from the plant’s layout and the engineering company’s duct design, prepare 2D and 3D shop drawings and, where appropriate, finite element analysis of duct, fittings and supports, and ship duct in sections sized for the site and the cranes available. During the shutdown we can inspect, install or supervise installation of FRP equipment, as we have done at the Glencore PASAR smelter.
What we need to quote
- Gas composition, with SO₂, SO₃, chlorides and fluorides, and condensate chemistry
- Normal, maximum and upset gas temperatures and their duration
- Design pressure and vacuum, including fan shut-off
- Duct sizes, layout or isometric, fittings, dampers and expansion joints
- Shutdown dates, installation scope and inspection requirements
FRP for smelting and refining: frequently asked questions
What temperature can FRP smelter duct take?
It depends on the resin and the gas. Standard vinyl ester covers most wet SO₂ off-gas; novolac and high-temperature novolac vinyl esters go further, and we have supplied duct for 360 °F (182 °C) HCl gas. The design must include upset temperatures and their duration.
Why does FRP duct blister near blast gates and quenches?
Because of thermal shock: a sudden temperature change between the corrosion barrier and the structural wall. We prevent it with a graphite veil and graphite-filled resin in the barrier at hot spots, PTFE nozzle sleeves, and a resin selected for the upset temperature.
Can you install the duct at an operating smelter?
Yes. Crimar has installed its own duct systems, including dampers, expansion joints, transitions and flanges, at operating copper smelters, and has provided on-site inspection and installation supervision during shutdowns.
How large can FRP off-gas duct be?
We have delivered 48 to 120 in. (1,219–3,048 mm) round duct for smelter off-gas; larger diameters are designed to order, with the wall calculated for vacuum, span, wind and seismic loads.
Can you also supply steel and cast equipment for the smelter?
Yes. Through our sister company in China we supply boilers, tube bundles, steel piping, valves, slag pots, ladles and wear liners, inspected and documented like our FRP.
Can you work to a shutdown schedule?
Yes. Duct, dampers and expansion joints are built and inspected ahead of the shutdown, shipped in sections sized for the site, and installed or supervised by our team during the outage.
Do you supply acid plant equipment as well as duct?
Yes: acid pump tanks, weak-acid and cooling tower piping, humidifying tower covers, demister housings and scrubbers in FRP, and strong-acid valves and hot acid cooler tube bundles through our sister company in China.