Case study · Air treatment · FRP scrubbing package
A Complete FRP Gas-Scrubbing Package: Scrubbers, Ductwork & Dampers
Three FRP chemical scrubbers, the interconnecting and bypass ductwork, 10 spectacle blinds and 14 FRP isolation dampers, supplied as one package to Biorem for a direct air capture plant in West Texas, with Texas PE-stamped design calculations and on-site field service.
The project at a glance
| Case summary | This project |
|---|---|
| Industry | Air treatment for a direct air capture (DAC) facility |
| Customer | Biorem, odor-control and air-treatment system supplier, for a plant in West Texas |
| Problem | A three-stage chemical scrubbing train (one acid stage, two caustic stages) with all its duct and isolation, to fit together on site, with Texas PE-stamped design |
| Solution | One FRP package: 3 scrubber vessels in fire-retardant resin, interconnecting and bypass ductwork, 10 spectacle blinds and 14 FRP isolation dampers, all to Biorem’s drawings |
| Result | Ordered March 2024, fabricated and packed by late June 2024 against an August 2024 required date; shipped in three containers to Long Beach; Crimar crews then provided on-site field service in March and April 2025 |
The problem: a scrubbing train, not a single vessel
The air-treatment system needed an acid scrubber followed by two caustic scrubbers, with ductwork linking the vessels, the fan and a bypass, and isolation at every branch. Buying vessels, duct and dampers from different suppliers means mismatched flanges, different resin systems and a long list of interfaces to sort out in the field.
The vessels also needed structural calculations stamped by a Texas professional engineer for the site’s permit, and the whole package had to ship from overseas to arrive before the installation window.
- Acid and caustic scrubbing liquors in the same train
- Fire-retardant resin required for the scrubbers
- Bypass and isolation at every branch, including positive isolation with spectacle blinds
- Texas PE-stamped drawings and structural calculations
- Delivered DDP to the US port of entry
The solution: one coordinated FRP package

| Item | Qty | Specification |
|---|---|---|
| Chemical scrubber vessel, acid stage | 1 | 5 ft diameter × 23 ft high, fire-retardant resin, media support grating, access hatches with gaskets, flanged inlet and outlet, process connections, external pipe supports and instrument brackets |
| Chemical scrubber vessel, caustic stage | 2 | Same construction as the acid stage, to Biorem drawing 2717E-FAB-202 |
| Interconnecting and bypass ductwork | 1 lot | FRP duct: tank outlet, scrubber, fan inlet and fan outlet runs; flanges to ASME B16.47 Class 150 drilling |
| Spectacle blinds | 10 | 30 in, for positive isolation of branches |
| FRP isolation dampers | 14 | 30 in (DN750), 15.7 in face to face, worm-gear operated, seal for 1 % leakage, maximum 80 °C and 8 kPa, 56 lb each, ASTM D3982 flange drilling |
| Engineering | 1 | Texas PE-stamped drawings and structural calculations for the three scrubbers |
Because the scrubbers, duct and dampers were built together, the flanges, gaskets and bolt patterns match, the corrosion barrier is consistent across the train, and the package is drawing-controlled as one set.
Design choices in the package
- Fire-retardant resin for the scrubbers. The vessels were specified in fire-retardant resin, which limits flame spread if the packing or the surroundings catch fire.
- Dampers and spectacle blinds together. Dampers isolate and control flow in normal operation; spectacle blinds give positive isolation of a branch when people need to enter a vessel or work on the duct.
- Bypass ductwork. A bypass lets the system keep running while one stage is isolated, so maintenance does not mean a full shutdown.
- One flange standard. Duct flanges were drilled to ASME B16.47 Class 150 and dampers to ASTM D3982, matched across the package so bolts and gaskets fit the first time.
- Stamped calculations. Drawings and structural calculations for the three vessels were stamped by a Texas professional engineer as part of the order.
Fabrication, inspection and delivery

The purchase order was issued on 26 March 2024 with a required date of 19 August 2024. Flange rings were in fabrication by late May, and the vessels, duct and dampers were inspected and packed by 22 June 2024. Each scrubber, the ductwork and the dampers have their own inspection reports, with material certificates.

The package shipped in three containers to the port of Long Beach on DDP terms and went by road to the Texas site.
Field service after delivery
FRP equipment is only as good as its installation. Crimar sent field crews to the site in March 2025 and again in April 2025, when a crew of six carried out repairs to the ductwork and installed actuator bases on the dampers. Having the fabricator’s own team on site meant the work was done to the original laminate and flange details.
- On-site FRP duct repair and field lamination
- Actuator base installation on the dampers
- Same team that knew the drawings and the laminate design
Related pages: FRP scrubbers and towers, FRP ductwork and piping and FRP dampers.
Frequently asked questions
Can you supply scrubbers, ductwork and dampers as one package?
Yes. On this project three scrubbers, the interconnecting and bypass duct, 10 spectacle blinds and 14 dampers were built to one set of drawings with matched flanges and one resin system.
What size were the scrubbers?
Three vertical FRP chemical scrubbers, each 5 ft in diameter and 23 ft high: one acid stage and two caustic stages, in fire-retardant resin.
Can you provide PE-stamped calculations?
Yes. This order included drawings and structural calculations for the three scrubbers stamped by a Texas professional engineer.
What were the damper ratings?
30 in (DN750) FRP isolation dampers, worm-gear operated, with a seal for 1 % leakage, rated to 80 °C and 8 kPa.
How long did fabrication take?
The order was placed on 26 March 2024 and the package was packed for shipment by 22 June 2024, ahead of the 19 August 2024 required date.
Do you provide field service?
Yes. Crimar crews worked on site in March and April 2025 on duct repairs and actuator base installation.
What do you need to quote a scrubbing package?
Process flow and gas data, scrubbing chemistry, vessel and duct drawings or sizes, damper and isolation requirements, fire-retardant and code requirements, and the delivery point.
Need a complete FRP scrubbing package?
Send the process data and drawings and we will quote scrubbers, duct and dampers as one package.