FRP for Solvent Extraction (SX-EW)

Mixer-settlers, electrolyte tanks, covers and pond equipment — proven across the world’s SX-EW circuits.

Solvent extraction and electrowinning (SX-EW) is one of Crimar’s longest-running specialties. For more than 25 years we have supplied FRP tanks, mixer and settler components, electrolyte and raffinate tanks, launders, covers, piping and pond equipment to SX circuits for copper, zinc, nickel-cobalt and uranium, in the Americas, Europe, Africa and Asia.

The challenge

An SX circuit combines sulfuric acid, organic extractant in a kerosene-type diluent, acid mist and, in electrowinning, warm electrolyte. Metals corrode and poorly specified plastics degrade or swell in the organic. Settlers and ponds are large, tank houses run continuously, and any loss of organic or electrolyte is costly and a fire and environmental hazard.

FRP equipment in an SX-EW plant

AreaDutyWhat we supply
Mixers and settlersAqueous acid and organic phases, large spansMix tanks, settler components and repairs, launders, settler covers
Electrolyte and raffinateSulfuric acid electrolyte, warmElectrolyte, raffinate and pump tanks; interconnecting piping
Vapor controlAcid mist and kerosene vaporRectangular covers for acid and kerosene vapor; acid-mist scrubbers
PondsRaffinate and pregnant leach solution ponds with HDPE linersFoam-filled FRP pump barges, walkways and pipe floats
ClarificationProcess water and solution clean-upFRP clarifiers, such as a 25 ft clarifier for a zinc SX-EW plant

For SX-EW we build epoxy vinyl ester and isophthalic polyester laminates with corrosion barriers and surfacing veils selected for both the acid and the organic phase, and design settler and cover structures for the spans and loads of large units and for on-site assembly. Where static dissipation is specified, the corrosion barrier is made conductive with a carbon veil or conductive fillers.

Project record

  • Zinc recovery SX-EW plant, California (engineered by Jacobs, 2001): 125 FRP tanks from 4 to 22 ft in diameter, FRP piping and a 25 ft clarifier, with on-site tank and piping assembly.
  • Freeport-McMoRan / Hatch, Indonesia (2024): 98 FRP vessels for a precious metals recovery plant.
  • Freeport-McMoRan, Sierrita SX plant, Arizona: FRP tanks built in China and field-assembled.
  • Uranium SX plant, Saskatchewan (2014): solvent extraction equipment made in China.
  • SX-EW plant, Spain and nickel-cobalt project, Madagascar: FRP equipment; we have also built 18.4 m FRP covers for hot acid vapor in Madagascar.
  • Copper mine, Arizona: settler repairs and a new mix tank.
  • Pond equipment: more than 70 FRP pump barges, 240 walkway sections and 100 floating pipe supports. Case study.

Standards

StandardApplies to
ASME RTP-1; ASTM D3299 / D4097Tanks and vessels; RTP-1 for pressure, vacuum and hazardous service
ISO 9001, ITP and MDRAll equipment; third-party inspection on request

How we work on SX-EW projects

Crimar mainly builds to the drawings and specifications of the end user and their engineering company, and adds the design input that is specific to FRP: resin and corrosion-barrier selection, laminate thickness, stiffening, nozzles, flanges, thermal expansion and supports. Every project runs on an inspection and test plan with hold and witness points and ends with a Manufacturing Data Record. We make FRP equipment in the USA, Mexico and China depending on the project, to Crimar’s specifications, and install it or supervise installation on site where needed.

SX plants are usually built to an engineering company’s or technology supplier’s design. We review the process conditions with them, select the resin for both the aqueous and organic phases, and design settler, launder and cover structures for the spans, liquid loads and site assembly. For existing plants we inspect and repair settlers and tanks, and supply replacement mix tanks and covers to fit the original layout.

What we need to quote

  • Equipment list or general arrangement with tag numbers
  • Aqueous and organic phase chemistry: acid concentration, extractant and diluent, temperature
  • Settler and tank dimensions, covers and launders required
  • Static-control and fire requirements for organic areas
  • Site loads, delivery and installation scope

FRP for solvent extraction: frequently asked questions

Is FRP compatible with SX organic and kerosene diluent?

Yes, when the resin and corrosion barrier are selected for it. Vinyl ester laminates are widely used in SX service; the resin is confirmed against the manufacturer’s chemical resistance data for the extractant, diluent and acid at operating temperature.

Can you repair existing FRP settlers?

Yes. We have carried out settler repairs and supplied a new mix tank for a copper SX plant in Arizona, and we inspect existing equipment before recommending repair or replacement.

How are large settlers and tanks delivered to site?

Either shop-built in sections and bonded on site, or oblated for shipping and reassembled; for the largest tanks we can wind on site. On a zinc SX-EW plant in California we assembled 125 tanks and the piping on site.

Do you supply pond equipment?

Yes. Foam-filled FRP pump barges, floating walkways and pipe floats keep pumps at constant submergence in raffinate and PLS ponds with nothing metallic touching the HDPE liner; more than 70 barges have been supplied since 1997.

Can SX covers control vapor and static?

Yes. Rectangular FRP covers contain acid and kerosene vapor over settlers and tanks, and where static control is specified the corrosion barrier is made conductive with a carbon veil or conductive fillers and grounded.

What resin do you use for electrolyte tanks?

Usually a bisphenol-A epoxy vinyl ester such as Derakane 411 for sulfuric acid electrolyte at normal tank house temperatures, confirmed against the resin manufacturer’s data for the acid strength and temperature; hotter service moves to a novolac vinyl ester.

Can you supply an entire SX plant’s FRP package?

Yes. For a zinc SX-EW plant in California we supplied 125 FRP tanks, the FRP piping and a 25 ft clarifier, and assembled the tanks and piping on site.

Talk to our SX-EW specialists