Most problems with fiberglass (FRP) equipment in mining service are written into the specification before the first layer of glass goes down. When the owner, the engineer and the fabricator agree five things at the start of a project — the real service conditions, the corrosion barrier and how it will be inspected, the governing standard, what will be attached, and how the equipment gets to site — most field failures, change orders and shipping surprises go away. This article explains each of the five questions, with examples from Crimar projects, and ends with the cases where FRP is not the right material.
The five questions at a glance
| Question | What to put in the specification | What goes wrong if it is missing |
|---|---|---|
| 1. What is really in it, and how hot does it get? | Full chemistry, normal and upset temperatures, temperature cycling, heat sources | Wrong resin; blistering from thermal shock |
| 2. What is the corrosion barrier, and how will you inspect it? | Barrier thickness (at least 0.10 in. under ASME RTP-1), internal access, an inspection plan | Liner failure found only when the structure leaks |
| 3. Which standard applies, and does it cover the equipment? | ASME RTP-1, ASTM D3299 / D4097, or SMACNA, plus the vacuum cases | Ductwork or tanks outside the range of the tables they were designed from |
| 4. What will be attached to it? | Agitators, catwalks, covers, piping loads, and maintenance access | Late redesign; equipment the operators cannot maintain |
| 5. How big is it, and how will it get to site? | Diameter, shipping method, field assembly, sourcing rules such as BABA | A tank that cannot travel, or cannot be made where it was planned |
1. What is really in it, and how hot does it really get?
Specify the complete chemistry and the worst-case temperature, not just the normal operating point — the resin is chosen from both. FRP is not one material. A standard vinyl ester resin covers a great deal of acid service; higher temperatures call for a novolac vinyl ester, and fire-retardant resins are used where fire is a concern. A data sheet that says only “sulfuric acid, ambient” leaves out what else is in the stream and what happens during an upset.
Temperature is the condition most often underestimated. Up to about 180 °F there is a large body of published design data. Above that, ASME RTP-1 calls for special design attention and the resin manufacturer should review the application. Higher temperatures are routine for us, but they have to be designed for.

Example: thermal shock at a heating element. A water treatment plant in Colorado recently sent us photos of a hot-water tank we supplied about 20 years ago. The outside showed only a couple of small cracks. The internal inspection told a different story: large blisters between the corrosion barrier and the structural wall, worst around the heating element, where the laminate had seen sudden temperature changes in the same spot for two decades. We recommended replacement. For the new tank we proposed a PTFE (Teflon) sleeve on the heater nozzle, and graphite veil with graphite-filled resin in the corrosion barrier around that zone, which moves heat into the structure faster and reduces thermal shock. The same detail is used in smelter ductwork near furnace blast gates and in quench vessels where hot gas is blown in. Twenty years ago, nobody put it in the specification.
For resin selection by chemical, see the resin FAQ on our FRP tanks and vessels page.
2. What is the corrosion barrier, and how will you inspect it?
Write the corrosion barrier into the specification and plan internal inspection from day one; the barrier is the part that fails first and the part you cannot see. An FRP wall has two layers. The inner corrosion barrier is resin-rich and keeps the chemical away from the glass; ASME RTP-1 requires it to be at least 0.10 in. thick. Behind it, the structural wall carries the load. Once the barrier is breached, the structure is next.

On a filament-wound tank, liquid that gets past a failed liner can follow the glass strands around the shell and appear somewhere else entirely. The leak you see on the outside is often not where the liner failed on the inside. That is why the specification should include:
- a manway or other access sized for internal inspection;
- an inspection interval and what will be checked — blisters, cracks, exposed fibers, discoloration;
- who inspects, and what triggers repair or replacement.
Matched to its chemistry and inspected regularly, an FRP tank typically lasts 20 to 30 years or more. Service-life evidence, including the Florida leachate tanks reported by the American Composites Manufacturers Association, is summarized on our FRP tanks and vessels page.
3. Which standard applies, and does it cover your equipment?
Name the standard in the specification and check that the equipment actually falls inside its scope — size, temperature, pressure and support spacing all have limits. For tanks, ASME RTP-1 is the standard to use when there is pressure or vacuum, or when the contents are hazardous. For atmospheric storage, ASTM D3299 (filament-wound) and ASTM D4097 (contact-molded) are usually enough. A fuller comparison is in the “RTP-1 or ASTM?” answer on our tanks page.
| Standard | What it covers | Limits to check | Use it when |
|---|---|---|---|
| ASME RTP-1 | Design, fabrication and inspection of stationary FRP vessels for corrosive service | Up to 15 psig internal or external pressure | There is pressure or vacuum, or the contents are hazardous |
| ASTM D3299 | Filament-wound, corrosion-resistant FRP tanks | Atmospheric service | Plain atmospheric storage, filament-wound construction |
| ASTM D4097 | Contact-molded (hand lay-up), corrosion-resistant FRP tanks | Atmospheric service | Plain atmospheric storage, contact-molded construction |
| SMACNA Thermoset FRP Duct Construction Manual | Wall-thickness tables for FRP ductwork | 4 to 72 in. diameter, up to 180 °F, supports at 10 ft | Ductwork within those limits; anything larger, hotter or with wider support spacing needs project-specific calculation |
Do not forget vacuum. A tank sees vacuum when it is pumped down, when it drains, and when hot contents cool. Each of those cases belongs on the design form.
Large ductwork is often outside the tables. Much of the ductwork at a smelter or an SX-EW plant is larger than 72 in., hotter than 180 °F, or supported farther apart than 10 ft. Then wall thickness has to be calculated for that project rather than read from the tables. See FRP ductwork for how we approach large-diameter duct.
Supports and expansion joints must be designed for FRP. FRP expands with temperature differently from steel, so supports and expansion joints should be designed for the FRP system, not copied from steel drawings.
4. What is going to be attached to it?
List every attachment and load at the start — agitators, catwalks, covers and piping all change the laminate design and the price. Every nozzle and every external load affects the design. A customer recently asked whether a 4-ft catwalk could sit directly on a rectangular tank. It could, but only after the man-loading was checked. Items like this are easy to design in and expensive to add later.
Ask the maintenance team before the design is frozen. On a recent proposal for a large FRP thickener cover, the customer’s engineers added three requirements that were not in the original inquiry:
- put the connections outside the tank, where they can be reached;
- make the center panels removable one at a time, for access to the equipment underneath;
- avoid pocket-shaped panels, which collect rainwater and salt — an earlier design had been rejected by the owner for exactly that reason.
That kind of operating knowledge is worth more than any calculation. See FRP covers and internals for cover construction.
5. How big is it, and how will it get to the site?
Decide the shipping and construction method before the plant layout is frozen, because the diameter decides how the tank is built. By road, the practical limit for a finished tank is about 4.5 m, roughly 15 ft in diameter. Above that there are two routes: build the shell in the shop and oblate it (press it into an oval) for shipping, or wind the tank on site. Both work.

We built a 350,000-gallon water tank in Arizona in sections: the wall sections were trucked about 1,500 miles, bonded together on site and hydro-tested, and the tank cost less than a stainless-steel equivalent.
Settle sourcing rules early. If a project carries Build America, Buy America (BABA) or similar requirements, tell the fabricator at the start; it decides where the equipment can be made.
When these questions are answered early, large projects go well:
- Zinc recovery plant, Salton Sea, California (engineered by Jacobs): 125 FRP tanks from 4 to 22 ft in diameter, with on-site assembly. Details on our solvent extraction page.
- Precious metals recovery plant, Indonesia, for Freeport-McMoRan and Hatch: 98 FRP vessels.
Neither would have worked without the owner, the engineer and the fabricator at the same table from the beginning.
When FRP is not the answer
FRP is usually the right choice for hydrochloric acid, chloride-bearing liquors and dilute sulfuric acid — but not for high pressure, temperatures beyond the resin’s limits, or heavy abrasion without a specific design. Chlorides pit stainless steel, and rubber-lined steel is heavy and needs its lining maintained for the life of the tank; that is why FRP is common in services like gold-plant acid wash vessels. But ASME RTP-1 stops at 15 psig, so high-pressure duty needs a different product. Where the temperature exceeds what the resins can take, or where there is heavy abrasion, talk to the fabricator before specifying FRP. Sometimes the honest answer is to use something else.
Frequently asked questions
What should be decided before specifying FRP equipment for a mine or smelter?
Five things: the full chemistry and worst-case temperature, the corrosion barrier and inspection plan, the governing standard and whether the equipment fits inside it, every attachment and load, and the size and shipping method. Agree them between owner, engineer and fabricator before the design is frozen.
How do you protect an FRP tank from thermal shock near a heating element?
Typical measures are a PTFE sleeve on the heater nozzle and graphite veil with graphite-filled resin in the corrosion barrier around the heated zone, which spreads heat into the structure and reduces local thermal shock. The same approach is used near smelter blast gates and in quench vessels.
How thick should the corrosion barrier be, and how should it be inspected?
ASME RTP-1 requires a corrosion barrier of at least 0.10 in. The specification should also provide internal access and a regular inspection plan, because on filament-wound tanks a leak on the outside is often far from the liner failure inside.
Do the SMACNA tables cover large smelter or SX-EW ductwork?
Often not. The SMACNA FRP duct tables cover 4 to 72 in. diameter, up to 180 °F, with supports at 10 ft. Larger, hotter or more widely supported ductwork needs a project-specific calculation.
What is the largest FRP tank that can be shipped by road?
About 4.5 m (roughly 15 ft) in diameter as a finished tank. Larger tanks are shop-built and oblated for shipping, built in sections and bonded on site, or wound on site.
When should FRP not be used?
For pressures above the 15 psig limit of ASME RTP-1, temperatures beyond what the resins can take, or heavy abrasion without a specific design. In those cases discuss alternatives with the fabricator first.