Skip to content
Crimar Industrial
  • Home
  • FRP Products
    • FRP Tanks & Vessels
    • FRP Ductwork & Piping
    • FRP Scrubbers & Towers
    • FRP Covers & Clarifiers
    • FRP Dampers & Expansion Joints
  • Equipment
    • Crushing & Milling
    • Wear Parts & Castings
    • Steel Process Equipment
    • Solid-Liquid Separation
    • Valves & Dampers
    • Pressure Vessels
  • Industries
    • Mining & Mineral Processing
    • Solvent Extraction (SX-EW)
    • Smelting & Refining
    • Water & Wastewater
    • Power & Flue-Gas
    • Chemical, Oil & Gas
  • Capabilities
    • Fabrication
    • Engineering & Design
    • Quality & Inspection
    • Standards & Compliance
  • Projects
    • FRP-Lined Butterfly Dampers
    • FRP Lamella Plate Packs
    • FRP Scrubber Package
    • Custom FRP Acid-Wash Vessel
    • Gold ADR Acid Wash Vessels
    • FRP Pump Barges
    • FRP Belt Guards & Pulley Covers
  • Insights
  • Resources
  • About
  • Contact
  • Get a Quote

erp

FRP Trough-Type Cable Tray: What a Factory Release Inspection Checks

November 2, 2026 by erp

A solid-bottom FRP cable tray is only as good as the checks it passes before it ships. This article walks through the release inspection on a recent Crimar order of about 1,100 m of green, trough-type FRP cable tray, so an engineer or buyer can see what is measured, to what tolerance, and what is … Read more

Categories Insights

Gold Above $4,000: Where FRP Equipment Fits in Gold Processing Plants

October 16, 2026 by erp
Custom FRP acid-wash vessel for corrosive process service

Gold above US$4,000 an ounce is bringing idle heap leach plants back and driving new processing capacity. Where corrosion concentrates in a gold plant, and where FRP acid wash vessels, tanks, scrubbers and pump barges fit.

Categories Insights
© 2026 Crimar Industrial · Crimar Holdings dba Crimar Industrial since 1988 · Privacy